Cable Domes International Ltd

Highcroft, Coldharbour Lane, Bletchingley, Surrey. RH1 4NA. UK

Tel: 0870 7744555

Fax: 0870 0116766

E-Mail: johnwright@cabledomes.co.uk

Home PagePicture GallerySizes and PricesUK ProjectsCovair DomesContact Us

 

Layer breakdown

 

 

Ground Work

 

 

Access

 

 

Power & Lighting

  

 

Main Membrane

 

The main membrane is manufactured from a Polyester fabric coated with PVC on both sides. It can be coloured green up to a height of three to four metres for good ball visibility with a translucent white fabric on the roof area to let in maximum natural light.
 

Thermal Insulation

 

A 10mm thick translucent layer of Polyurethane insulation is placed on top of the main membrane to provide an efficient thermal barrier to keep in heat and conserve energy.

 

Protective Foil

 

A thin Polyurethane foil is placed on top of the insulation layer to provide protection for the main membrane against the steel cables, atmospheric pollution and dirt. This can be changed when dirty every 3 - 4 years at a minimal cost to ensure maximum daylight passes through.

 

Steel Cable-Net

 

A net of galvanised steel rope is laid on the sandwich of membranes providing a strong cover that moulds the shape of the inflated membranes and takes up most of the stresses.

 

[HOME PAGE]     [GET IN TOUCH]

 

Website Designed and Developed by Eugene Bann.